Project Management & Agile terms
PMBOK, EVM, scheduling, Scrum, Kanban, SAFe, Lean Six Sigma, PRINCE2 and business analysis.
Study this subject with thinQcards™
- 100 Percent RuleWBS principle that the WBS includes all the work of the project, including project management, and nothing more.Intermediate
- 5SLean workplace organization method: Sort, Set in order, Shine, Standardize, Sustain.Foundational
- A Guide to the Business Analysis Body of Knowledge (BABOK Guide)IIBA's globally recognized standard for business analysis practice, currently version 3.Foundational
- A Guide to the Project Management Body of Knowledge (PMBOK Guide)PMI's foundational standard and guide describing project management principles, performance domains, and practices.Foundational
- Ability to Innovate (A2I)EBM Key Value Area measuring the organization's capability to deliver new capabilities that meet needs.Advanced
- Acceptance CriteriaConditions a product or backlog item must satisfy to be accepted by the product owner or customer.Foundational
- Accepted DeliverablesProducts, results, or capabilities produced by a project and validated by the customer or sponsor as meeting acceptance criteria.Foundational
- ActivityA distinct, scheduled portion of work performed during the course of a project.Foundational
- Actual CostThe realized cost incurred for the work performed on an activity during a specific time period.Foundational
- Adaptive ApproachA development approach in which requirements are elaborated and refined iteratively as the project proceeds.Foundational
- Affinity DiagramTechnique for organizing a large number of ideas into groups based on natural relationships.Foundational
- Affinity EstimatingTechnique of quickly grouping many items into size categories by placing them relative to one another.Intermediate
- Agile ContractingContract approaches that accommodate changing scope while managing buyer and seller risk.Advanced
- Agile ManifestoThe 2001 Manifesto for Agile Software Development, stating four values and twelve principles.Foundational
- Agile Practice GuidePMI and Agile Alliance guide on applying agile approaches, published with PMBOK 6 in 2017.Intermediate
- Agile PrinciplesThe twelve principles behind the Agile Manifesto.Foundational
- Agile Release Train (ART)A long-lived team of agile teams that incrementally develops, delivers, and often operates one or more solutions in a value stream.Foundational
- AI Go/No-Go DecisionCPMAI checkpoint assessing whether an AI project should proceed based on business, data, and implementation feasibility.Intermediate
- Alternative Dispute Resolution (ADR)Methods such as mediation and arbitration used to resolve contract disputes without litigation.Intermediate
- Analogous EstimatingTechnique for estimating duration or cost using historical data from a similar activity or project.Foundational
- AndonLean visual signal (cord, button, or light) used to alert that a problem has occurred and work should stop to address it.Intermediate
- Architectural RunwayExisting code, components, and infrastructure needed to implement near-term features without excessive redesign.Advanced
- ART Planning BoardSAFe visual board showing feature delivery dates, dependencies between teams, and milestones for a PI.Intermediate
- ART Predictability MeasureSAFe measure comparing actual business value achieved to planned business value of committed PI objectives.Advanced
- AssumptionA factor in the planning process that is considered true, real, or certain without proof or demonstration.Foundational
- Assumption LogA project document used to record all assumptions and constraints throughout the project life cycle.Foundational
- Assumption MappingTechnique for identifying and prioritizing product assumptions by importance and evidence.Advanced
- Backward PassCPM calculation of late start and late finish dates moving from project end to start.Intermediate
- Basis of EstimatesSupporting documentation describing how an estimate was derived.Intermediate
- Benefit-Cost Ratio (BCR)Ratio of the present value of benefits to the present value of costs.Intermediate
- Benefits Management ApproachPRINCE2 management product defining how and when benefits will be measured, including after the project closes.Intermediate
- Benefits Management PlanDocument describing how and when project benefits will be delivered and measured.Intermediate
- Benefits RealizationThe practice of ensuring that the outcomes of projects and programs produce measurable benefits for the organization.Intermediate
- Bid DocumentsDocuments used to solicit information, quotations, or proposals from prospective sellers.Foundational
- Bidder ConferenceMeetings with prospective sellers before proposal submission to ensure all have a clear, common understanding of the procurement.Intermediate
- Bottom-Up EstimatingMethod of estimating by aggregating estimates of lower-level WBS components.Foundational
- BrainstormingGroup technique for generating many ideas in a short time without initial criticism.Foundational
- Budget at Completion (BAC)The sum of all budgets established for the work to be performed.Foundational
- Budget EstimateAn estimate prepared during planning with an accuracy range often cited as -10% to +25%.Intermediate
- Build-Measure-LearnLean Startup feedback loop: build an experiment, measure results, learn, then pivot or persevere.Intermediate
- Burndown ChartChart showing remaining work versus time in an iteration or release.Foundational
- Burnup ChartChart showing completed work rising over time against a separate total scope line.Foundational
- Business Analysis Core Concept Model (BACCM)BABOK conceptual framework of six core concepts: Change, Need, Solution, Stakeholder, Value, and Context.Foundational
- Business Analysis Knowledge AreasThe six BABOK v3 groupings of business analysis tasks, from planning and elicitation through strategy, design definition, and solution evaluation.Foundational
- Business OwnersSmall group of SAFe stakeholders with primary business and technical responsibility for an ART's governance and ROI.Intermediate
- Business Process Model and Notation (BPMN)OMG standard graphical notation for modeling business processes.Intermediate
- Business Rules AnalysisTechnique to define the rules that govern decisions in an organization and constrain operations.Intermediate
- Capability (SAFe)Higher-level solution behavior in SAFe Large Solution, typically spanning multiple ARTs and delivered in a PI.Advanced
- CapacityThe amount of work a team can take on in an iteration given availability.Foundational
- Change AuthorityPRINCE2 person or group delegated by the Project Board to approve requests for change or off-specifications within limits.Intermediate
- Change Control Board (CCB)A formally constituted group responsible for reviewing, evaluating, approving, deferring, or rejecting changes to the project.Foundational
- Change LogA comprehensive list of changes submitted during the project and their current status.Foundational
- Change Management PlanComponent of the project management plan establishing the change control board, its authority, and how change control will be administered.Intermediate
- Change Request (CR)A formal proposal to modify a document, deliverable, or baseline.Foundational
- Change StrategyBABOK output describing the approach to move from current to future state, including solution scope, transition states, and release planning.Advanced
- Check SheetA structured form for collecting data in real time at the location where it is generated.Foundational
- Checkpoint ReportPRINCE2 progress report from a Team Manager to the Project Manager on a work package.Intermediate
- Claims AdministrationProcess of documenting, processing, monitoring, and managing contested changes and disputes between buyer and seller.Advanced
- Classes of ServicePolicies that define how different types of work items are treated in a Kanban system.Advanced
- Close Project or PhaseProcess of finalizing all activities for the project, phase, or contract.Foundational
- Coding StandardXP practice of agreeing to common coding conventions so the code looks as if one person wrote it.Intermediate
- Cognitive Project Management for AI (CPMAI)Vendor-neutral, data-centric, iterative methodology for running AI and machine learning projects, now offered by PMI as PMI-CPMAI.Intermediate
- Collect RequirementsProcess of determining, documenting, and managing stakeholder needs and requirements to meet objectives.Foundational
- Collective Code OwnershipXP practice in which any team member can change any part of the codebase.Intermediate
- ColocationPlacing many or all active team members in the same physical location to enhance teamwork.Foundational
- Common Cause VariationNatural, inherent variation in a stable process due to many small random factors.Intermediate
- Communication ChannelsThe number of potential communication paths among project stakeholders: n(n - 1) / 2.Foundational
- Communication MethodsThe approaches for sharing information: interactive, push, and pull.Foundational
- Communication ModelModel describing how information is exchanged between sender and receiver, including encoding, transmitting, decoding, acknowledging, and feedback.Intermediate
- Communications Management PlanComponent of the project management plan describing how, when, and by whom information will be administered and disseminated.Foundational
- Conduct ProcurementsProcess of obtaining seller responses, selecting a seller, and awarding a contract.Intermediate
- Cone of UncertaintyConcept that estimate uncertainty is greatest early in a project and narrows as information is gained.Intermediate
- Configuration Management PlanComponent of the project management plan describing how to identify, account for, and control versions of configurable items.Intermediate
- Conflict ManagementApproaches to resolving disagreements: withdraw/avoid, smooth/accommodate, compromise/reconcile, force/direct, and collaborate/problem-solve.Foundational
- ConstraintA limiting factor that affects the execution of a project, program, portfolio, or process.Foundational
- Context DiagramA scope model showing a system and the external entities that interact with it, with inputs and outputs.Foundational
- Contingency PlanA predefined response to implement if a risk trigger occurs.Intermediate
- Contingency ReserveTime or money allocated in the baseline for identified risks with planned responses ('known-unknowns').Foundational
- Continuous Delivery PipelineSAFe workflows, activities, and automation needed to move new functionality from ideation to on-demand release.Advanced
- Contract TypesCategories of agreements that allocate risk between buyer and seller: fixed-price, cost-reimbursable, and time and materials.Foundational
- Control AccountA management control point where scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement.Advanced
- Control ChartA graph showing process data over time against a mean and upper and lower control limits to determine whether a process is stable.Foundational
- Control PlanDocument describing the actions, measurements, and responses required to sustain process improvements.Intermediate
- Control ProcurementsProcess of managing procurement relationships, monitoring contract performance, making changes, and closing contracts.Intermediate
- Control QualityProcess of monitoring and recording quality activity results to ensure outputs are complete, correct, and meet expectations.Intermediate
- Control ScheduleProcess of monitoring project status to update the schedule and manage changes to the schedule baseline.Intermediate
- Control ScopeProcess of monitoring the status of project and product scope and managing changes to the scope baseline.Foundational
- Cost BaselineThe approved, time-phased budget of the project, excluding management reserves.Foundational
- Cost of Delay (CoD)The economic impact of delaying delivery of a piece of work.Intermediate
- Cost of Poor Quality (COPQ)Costs that would disappear if every activity were performed without defects.Intermediate
- Cost of Quality (COQ)All costs of preventing nonconformance, appraising conformance, and failing to meet requirements over the product life.Foundational
- Cost Performance Index (CPI)Measure of cost efficiency of budgeted resources: CPI = EV / AC.Foundational
- Cost Plus Award Fee Contract (CPAF)Cost-reimbursable contract in which the fee is based on a subjective evaluation of performance by the buyer.Advanced
- Cost Plus Fixed Fee Contract (CPFF)Cost-reimbursable contract in which the seller is reimbursed allowable costs plus a fixed fee calculated on initial estimated costs.Intermediate
- Cost Plus Incentive Fee Contract (CPIF)Cost-reimbursable contract where the seller gets allowable costs plus an incentive fee based on achieving performance objectives.Advanced
- Cost Variance (CV)The amount of budget deficit or surplus at a point in time: CV = EV - AC.Foundational
- CPMAI Business UnderstandingCPMAI Phase I: defining the business problem, whether AI is the right solution, the AI pattern, and success criteria.Intermediate
- CPMAI Data PreparationCPMAI Phase III: cleaning, transforming, labeling, augmenting, and engineering data for model training.Intermediate
- CPMAI Data UnderstandingCPMAI Phase II: identifying data sources, quantity, quality, access, and labeling needs for the AI solution.Intermediate
- CPMAI Model DevelopmentCPMAI Phase IV: selecting algorithms or pretrained models, training, and tuning to meet the defined success criteria.Intermediate
- CPMAI Model EvaluationCPMAI Phase V: assessing model performance against technical metrics and business success criteria.Intermediate
- CPMAI Model OperationalizationCPMAI Phase VI: deploying the model into production and monitoring, maintaining, and governing it.Intermediate
- Crash Cost per DayThe incremental cost of shortening an activity by one time unit: (crash cost - normal cost) / (normal time - crash time).Advanced
- CrashingSchedule compression technique that shortens duration by adding resources, usually at increased cost.Intermediate
- Create WBSProcess of subdividing project deliverables and work into smaller, more manageable components.Foundational
- Critical Chain Method (CCM)Scheduling method that accounts for limited resources and uses buffers to protect the project end date.Advanced
- Critical PathThe sequence of activities that represents the longest path through a project and determines the shortest possible duration.Foundational
- Critical Path Method (CPM)Method used to estimate the minimum project duration and determine schedule flexibility on logical network paths.Foundational
- Critical to Quality (CTQ)A measurable characteristic of a product or process that is critical to customer satisfaction.Intermediate
- Cross-Functional TeamA team whose members collectively have all skills necessary to create value each iteration.Foundational
- CrystalFamily of human-centric agile methods by Alistair Cockburn, scaled by team size and project criticality.Advanced
- Cumulative Flow Diagram (CFD)Stacked area chart showing the number of work items in each workflow state over time.Intermediate
- Current Value (CV)EBM Key Value Area revealing the value the product delivers today.Advanced
- Customer Journey MapVisualization of the steps, touchpoints, emotions, and pain points a customer experiences over time.Intermediate
- Cycle TimeThe elapsed time from when work starts on an item to when it finishes.Foundational
- Cynefin FrameworkSense-making framework by Dave Snowden classifying situations as clear, complicated, complex, chaotic, or confused.Intermediate
- Daily ScrumA 15-minute event for Developers to inspect progress toward the Sprint Goal and adapt the Sprint Backlog.Foundational
- Data DateThe point in time when the status of the project is recorded.Advanced
- Data Flow Diagram (DFD)Model showing how information flows through processes, data stores, and external entities.Intermediate
- Decision ModelingTechnique showing how repeatable business decisions are made using decision tables, trees, or DMN.Advanced
- Decision Tree AnalysisDiagramming and calculation technique for evaluating alternative choices under uncertainty using expected monetary value.Advanced
- Decision-Making TechniquesGroup methods for reaching decisions, such as unanimity, majority, plurality, autocratic, fist of five, and Roman voting.Intermediate
- DecompositionTechnique for dividing and subdividing scope and deliverables into smaller, more manageable parts.Foundational
- Defect RepairAn intentional activity to modify a nonconforming product or product component.Foundational
- Defects per Million Opportunities (DPMO)Six Sigma metric: (defects / (units x opportunities per unit)) x 1,000,000.Intermediate
- Define ActivitiesProcess of identifying and documenting the specific actions to be performed to produce deliverables.Foundational
- Define ScopeProcess of developing a detailed description of the project and product.Foundational
- Definition of Done (DoD)A formal description of the state of the Increment when it meets the quality measures required for the product.Foundational
- Definition of Ready (DoR)An optional team agreement on criteria a backlog item must meet before it can be selected for a Sprint.Intermediate
- Definition of Workflow (DoW)In Kanban, the explicit shared understanding of what flow means for a team: units, start and finish points, states, WIP controls, and SLE.Advanced
- Definitive EstimateA detailed, high-accuracy estimate typically in the range of -5% to +10%.Intermediate
- Dependency TypesClassification of activity dependencies as mandatory, discretionary, external, or internal.Intermediate
- Design for X (DfX)Technical guidelines applied during design to optimize a specific aspect such as reliability, cost, assembly, or usability.Advanced
- Design of Experiments (DOE)Statistical method for determining which factors and interactions affect a process output.Advanced
- Design ThinkingHuman-centered approach to innovation: empathize, define, ideate, prototype, and test.Foundational
- Determine BudgetProcess of aggregating estimated costs of activities or work packages to establish an authorized cost baseline.Intermediate
- Develop Project CharterProcess of creating the document that formally authorizes the project's existence.Foundational
- Develop ScheduleProcess of analyzing activity sequences, durations, resources, and constraints to create the schedule model.Intermediate
- Develop TeamProcess of improving competencies, team interaction, and the team environment to enhance performance.Intermediate
- DevelopersThe Scrum accountability for people committed to creating any aspect of a usable Increment each Sprint.Foundational
- Development Value StreamIn SAFe, the sequence of activities to convert a business hypothesis into a technology-enabled solution.Advanced
- Direct and Indirect CostsDirect costs are attributable directly to the project; indirect costs are shared overhead allocated across projects.Foundational
- Direct and Manage Project WorkProcess of leading and performing the work defined in the plan and implementing approved changes.Intermediate
- Disciplined Agile (DA)PMI's hybrid, tool-kit approach that helps teams choose their way of working (WoW) based on context.Advanced
- Discrete EffortWork that can be planned and measured and that yields a specific output.Advanced
- DMADVSix Sigma design methodology: Define, Measure, Analyze, Design, Verify.Intermediate
- DMAICSix Sigma improvement cycle: Define, Measure, Analyze, Improve, Control.Foundational
- Document AnalysisElicitation technique of reviewing existing documentation to understand context and requirements.Foundational
- Double DiamondDesign process model with four phases: Discover, Define, Develop, Deliver.Intermediate
- Dual-Track AgileRunning product discovery and delivery in parallel tracks within the same team.Advanced
- Dynamic Systems Development Method (DSDM)Agile project framework emphasizing fixed time and cost with prioritized, flexible features.Advanced
- Earned Schedule (ES)Extension of EVM that measures schedule performance in time units rather than currency.Advanced
- Earned Value (EV)The measure of work performed expressed in terms of the budget authorized for that work.Foundational
- Earned Value Management (EVM)Methodology that integrates scope, schedule, and resources to objectively measure project performance and progress.Foundational
- ElicitationDrawing out, exploring, and identifying information relevant to a change from stakeholders and other sources.Foundational
- Emotional Intelligence (EI)The ability to identify, assess, and manage one's own emotions and those of others and groups.Foundational
- Empathy MapA collaborative visualization of what a user says, thinks, does, and feels.Intermediate
- EmpiricismThe principle that knowledge comes from experience and decisions are based on what is observed.Foundational
- EnablerSAFe backlog item that supports future business functionality, such as exploration, architecture, infrastructure, or compliance work.Intermediate
- End Project ReportPRINCE2 report given by the Project Manager to the Project Board at closure, reviewing performance against the PID.Intermediate
- Enhance (Risk Response)Opportunity response that increases the probability and/or impact of an opportunity.Intermediate
- Enterprise Environmental Factors (EEF)Conditions, not under the immediate control of the team, that influence, constrain, or direct the project.Foundational
- EpicA large body of work that can be broken down into smaller stories or features.Foundational
- Epic OwnerSAFe role responsible for coordinating portfolio epics through the Portfolio Kanban.Advanced
- Escalate (Risk Response)Risk response in which a threat or opportunity outside the project's scope or authority is passed to a higher level.Intermediate
- Estimate Activity DurationsProcess of estimating the number of work periods needed to complete individual activities with estimated resources.Foundational
- Estimate at Completion (EAC)The expected total cost of completing all work: commonly EAC = AC + ETC.Intermediate
- Estimate CostsProcess of developing an approximation of the monetary resources needed to complete project work.Foundational
- Estimate to Complete (ETC)The expected cost to finish all remaining project work: ETC = EAC - AC.Intermediate
- Evidence-Based Management (EBM)Scrum.org framework for measuring and improving value delivery using four Key Value Areas and goals at strategic, intermediate, and immediate tactical levels.Intermediate
- Exception ReportPRINCE2 report from the Project Manager to the Project Board when a stage or project is forecast to exceed tolerances.Intermediate
- Executive (PRINCE2)PRINCE2 role ultimately accountable for the project, ensuring it delivers value for money and owning the business case.Foundational
- Expected Monetary Value (EMV)Statistical value calculated as probability multiplied by impact for a risk, summed across outcomes.Intermediate
- Explicit KnowledgeKnowledge that can be codified using words, numbers, and pictures.Foundational
- Exploit (Risk Response)Opportunity response that seeks to ensure the opportunity definitely happens.Intermediate
- Extreme Programming (XP)Agile software development method created by Kent Beck emphasizing technical excellence and frequent releases.Foundational
- Failure Mode and Effects Analysis (FMEA)Structured method for identifying potential failure modes, their causes and effects, and prioritizing actions.Intermediate
- Fallback PlanAn alternative response used if the primary risk response proves ineffective.Intermediate
- Fast TrackingSchedule compression technique in which activities normally done in sequence are performed in parallel for at least part of their duration.Intermediate
- Feature (SAFe)A service that fulfills a stakeholder need, sized to be delivered by a single ART within a PI.Intermediate
- Feature-Driven Development (FDD)Agile method organized around designing and building client-valued features.Advanced
- Feeding BufferIn critical chain scheduling, a buffer placed where a non-critical chain feeds into the critical chain.Advanced
- Final ReportSummary of project performance prepared at closure.Foundational
- Firm Fixed Price Contract (FFP)Contract in which the price is set and not subject to change unless scope changes.Foundational
- First Pass Yield (FPY)Percentage of units completing a process step correctly the first time without rework.Intermediate
- Fishbone DiagramA cause-and-effect diagram that organizes potential causes of a problem into categories.Foundational
- Fitness for UseQuality definition attributed to Joseph Juran: a product is of quality if it meets real needs of its users.Intermediate
- Five WhysRoot cause technique of asking 'why' repeatedly, typically about five times, to move from symptom to underlying cause.Foundational
- Fixed and Variable CostsFixed costs do not change with production volume; variable costs change with the amount of work or output.Foundational
- Fixed Price Incentive Fee Contract (FPIF)Fixed-price contract with an incentive for meeting performance targets and a price ceiling.Advanced
- Fixed Price with Economic Price Adjustment (FP-EPA)Fixed-price contract allowing predefined adjustments for changing conditions such as inflation or commodity costs.Advanced
- Flow MetricsSAFe measures of flow: flow distribution, velocity, time, load, efficiency, and predictability.Advanced
- Forward PassCPM calculation of early start and early finish dates moving from project start to end.Intermediate
- Free FloatThe amount of time an activity can be delayed without delaying the early start of any successor.Intermediate
- Functional RequirementA requirement describing a capability or behavior the solution must provide.Foundational
- Funding Limit ReconciliationProcess of comparing planned expenditure with funding limits and adjusting the schedule to level expenditures.Advanced
- Gantt ChartA bar chart of schedule information with activities listed vertically and dates horizontally.Foundational
- GembaJapanese for 'the real place' where value is created; a gemba walk is going there to observe work.Intermediate
- Given-When-ThenA structured format for writing acceptance criteria and test scenarios, used in behavior-driven development.Intermediate
- Gold PlatingAdding extra features or functions beyond what was agreed, without customer request or approval.Foundational
- GovernanceThe framework of authority, accountability, and decision rights within which projects are directed and controlled.Intermediate
- Grade vs. QualityQuality is how well characteristics meet requirements; grade is a category for items with the same use but different technical characteristics.Foundational
- Ground RulesExpectations regarding acceptable behavior by project team members.Foundational
- Hammock ActivityA summary activity that groups related activities and spans their start and end dates.Advanced
- HeijunkaLean technique of leveling production by volume and mix over time.Advanced
- Highlight ReportPRINCE2 time-driven report from the Project Manager to the Project Board on stage progress.Intermediate
- HistogramA bar chart showing the frequency distribution of data.Foundational
- Hoshin KanriLean strategic planning method that aligns organizational goals with execution at all levels.Advanced
- Hybrid ApproachA combination of predictive and adaptive elements chosen to fit the project and its environment.Intermediate
- Hypothesis-Driven DevelopmentApproach that treats product ideas as hypotheses to be tested with measurable outcomes.Intermediate
- Identify RisksProcess of identifying individual project risks and sources of overall project risk and documenting their characteristics.Foundational
- Immediate Tactical GoalEBM's near-term, critical objective a team works on toward an intermediate goal.Advanced
- Impact AnalysisAssessment of the effects a proposed change will have on stakeholders, requirements, the solution, and the project.Intermediate
- Impact MappingStrategic planning technique linking a goal to actors, impacts (behavior changes), and deliverables.Advanced
- ImpedimentAnything that blocks or slows a team's progress toward its goal.Foundational
- Imposed DateA fixed date placed on an activity or milestone, such as 'start no earlier than' or 'finish no later than'.Intermediate
- IncrementA concrete stepping stone toward the Product Goal that is additive to all prior Increments and thoroughly verified.Foundational
- Incremental DevelopmentApproach that delivers a solution in successive usable pieces, each adding functionality.Foundational
- Individual Project RiskAn uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.Foundational
- Information RadiatorA highly visible display of project information placed where people can easily see it.Foundational
- Innovation and Planning Iteration (IP Iteration)A SAFe iteration at the end of each PI for innovation, PI Planning, Inspect and Adapt, and buffer.Intermediate
- Inspect and Adapt (I&A)A significant SAFe event held at the end of each PI to demonstrate, measure, and improve the ART.Intermediate
- Integrated Change ControlProcess of reviewing all change requests, approving or rejecting them, and managing changes to deliverables, documents, and the plan.Foundational
- Integrated IncrementIn Nexus, the current sum of all integrated work completed by the Scrum Teams in a Nexus.Advanced
- Interface AnalysisTechnique to identify where, what, why, when, how, and for whom information is exchanged between solution components or systems.Intermediate
- Intermediate GoalEBM goal that, when achieved, indicates progress toward a strategic goal.Advanced
- Internal Rate of Return (IRR)The discount rate at which a project's net present value equals zero.Intermediate
- INVESTMnemonic for good user stories: Independent, Negotiable, Valuable, Estimable, Small, Testable.Foundational
- Iron Triangle InversionAgile reframing of the triple constraint in which time and cost are fixed and scope is variable.Intermediate
- IssueA current condition or situation that may have an impact on project objectives.Foundational
- Issue LogA project document where information about issues is recorded and monitored.Foundational
- Iterative DevelopmentApproach that develops a solution through repeated cycles, refining it based on feedback each time.Foundational
- JidokaLean principle of automation with a human touch: stopping the process when a defect is detected.Intermediate
- Just-in-Time (JIT)Producing what is needed, when it is needed, in the amount needed.Foundational
- KaizenJapanese term for continuous, incremental improvement involving everyone.Foundational
- Kanban BoardA visual board with columns representing workflow states and cards representing work items.Foundational
- Kanban GuideConcise definition of Kanban by Daniel Vacanti and John Coleman (2020), focused on optimizing flow.Intermediate
- Kanban MethodDavid J. Anderson's evolutionary approach to improving knowledge work using kanban systems.Intermediate
- Kano ModelModel classifying product features by their effect on customer satisfaction: basic (must-be), performance (one-dimensional), and excitement (delighters).Intermediate
- Key Value Areas (KVA)EBM's four areas for assessing value and capability: Current Value, Unrealized Value, Ability to Innovate, and Time to Market.Intermediate
- Knowledge AreaAn identified area of project management defined by its knowledge requirements and processes.Foundational
- Large-Scale Scrum (LeSS)Framework for scaling Scrum to multiple teams working on one product, created by Craig Larman and Bas Vodde.Advanced
- Law of Diminishing ReturnsPrinciple that after a point, adding more input yields progressively smaller output gains.Intermediate
- Lead and LagLead is the time a successor can be advanced relative to a predecessor; lag is the time it must be delayed.Intermediate
- Lead TimeThe elapsed time from when a request is made (or committed) to when it is delivered.Foundational
- Lean Budget GuardrailsSAFe policies and practices for budgets, spending, and governance within a portfolio.Advanced
- Lean Business CaseA lightweight SAFe document capturing an epic's hypothesis, MVP, costs, and expected benefits.Advanced
- Lean Portfolio Management (LPM)SAFe competency that aligns strategy and execution by applying Lean and systems thinking to portfolio funding, operations, and governance.Advanced
- Lean ThinkingManagement philosophy derived from the Toyota Production System focused on maximizing customer value while minimizing waste.Foundational
- Learning CurvePrinciple that cost or time per unit decreases as experience with repetitive work increases.Intermediate
- Lessons Learned RegisterA project document recording knowledge gained during the project for use on the current and future projects.Foundational
- Letter of Intent (LOI)A non-binding document in which a buyer indicates the intent to award a contract.Intermediate
- Level of Effort (LOE)An activity that does not produce definitive end products and is measured by the passage of time.Advanced
- Life Cycle CostingConsidering the total cost of ownership of a product over its entire life, not just development cost.Intermediate
- Little's LawQueueing theorem stating average cycle time = average WIP / average throughput.Intermediate
- Logical Relationship TypesThe four dependency types between activities: finish-to-start, start-to-start, finish-to-finish, and start-to-finish.Intermediate
- Make-or-Buy AnalysisAnalysis used to determine whether work or deliverables are best produced internally or purchased externally.Foundational
- Manage by ExceptionPRINCE2 principle of setting tolerances for each objective and escalating only when tolerances are forecast to be exceeded.Foundational
- Manage Project KnowledgeProcess of using existing knowledge and creating new knowledge to achieve objectives and contribute to organizational learning.Intermediate
- Manage QualityProcess of translating the quality management plan into executable quality activities that incorporate quality policies.Intermediate
- Manage TeamProcess of tracking team member performance, providing feedback, resolving issues, and managing changes to optimize performance.Intermediate
- Management ReserveBudget withheld from the cost baseline for unforeseen work within project scope ('unknown-unknowns').Intermediate
- Managing a Stage BoundaryPRINCE2 process giving the Project Board what it needs to review the stage, approve the next stage plan, and confirm business justification.Intermediate
- Measurement System Analysis (MSA)Evaluation of a measurement system's accuracy, precision, and stability before relying on its data.Advanced
- Milestone ChartA summary schedule that shows only the planned start or completion dates of major deliverables and external interfaces.Foundational
- Minimum Marketable Feature (MMF)The smallest unit of functionality that delivers meaningful value to customers and can be released.Intermediate
- Minimum Viable Product (MVP)The version of a new product that allows a team to collect the maximum amount of validated learning with the least effort.Foundational
- Mob ProgrammingPractice in which the whole team works on the same thing, at the same time, at one computer.Intermediate
- Monitor and Control Project WorkProcess of tracking, reviewing, and reporting overall progress to meet performance objectives defined in the plan.Intermediate
- Monitor RisksProcess of monitoring the implementation of agreed-upon risk responses, tracking identified risks, identifying new risks, and evaluating effectiveness.Intermediate
- MoSCoW PrioritizationPrioritization technique classifying requirements as Must have, Should have, Could have, and Won't have (this time).Foundational
- Motivation TheoriesTheories explaining what drives people at work, including Maslow, Herzberg, McGregor, McClelland, and Vroom.Intermediate
- MudaJapanese term for waste: any activity that consumes resources without adding customer value.Foundational
- Multicriteria Decision AnalysisTechnique using a decision matrix to evaluate options against weighted criteria.Intermediate
- Muri and MuraLean terms for overburden (muri) and unevenness or variability (mura), which together with muda are the 3 Ms.Intermediate
- Near-Critical PathA path whose duration is close to the critical path and has little float.Intermediate
- Negative FloatFloat with a value below zero, indicating that the schedule cannot meet a required date.Advanced
- NegotiationDiscussion aimed at reaching an agreement between parties with shared or opposed interests.Foundational
- Net Present Value (NPV)The present value of future cash inflows minus the present value of outflows, discounted at a required rate.Intermediate
- Net Promoter Score (NPS)Customer loyalty metric based on likelihood to recommend, scored 0-10: % promoters (9-10) minus % detractors (0-6).Foundational
- NexusScrum.org framework for 3 to 9 Scrum Teams working on a single product with a single Product Backlog.Advanced
- Nexus Integration Team (NIT)Team in Nexus accountable for ensuring a done Integrated Increment is produced at least once every Sprint.Advanced
- Nominal Group Technique (NGT)Group technique that enhances brainstorming with a voting process to rank the most useful ideas.Intermediate
- Non-Functional Requirement (NFR)A requirement describing conditions or qualities the solution must have, such as performance, security, usability, or availability.Foundational
- North Star MetricThe single metric that best captures the core value a product delivers to customers.Intermediate
- Objectives and Key Results (OKR)Goal-setting framework pairing a qualitative objective with measurable key results.Intermediate
- Off-SpecificationPRINCE2 issue type for something that should be provided but currently is not, or is forecast not to be.Advanced
- Operations ManagementOversight of ongoing, repetitive business activities that produce and sustain products or services.Foundational
- Opportunity CostThe value of the next-best alternative forgone when a choice is made.Intermediate
- Opportunity Solution TreeVisual tool by Teresa Torres linking a desired outcome to customer opportunities, solutions, and experiments.Advanced
- Organizational Process Assets (OPA)Plans, processes, policies, procedures, and knowledge bases specific to and used by the performing organization.Foundational
- Organizational StructureHow an organization arranges authority, reporting, and resources, affecting project manager authority.Foundational
- Osmotic CommunicationInformation flowing into the background hearing of team members so they absorb relevant information passively.Intermediate
- Overall Project RiskThe effect of uncertainty on the project as a whole, arising from all sources including individual risks.Advanced
- Pair ProgrammingXP practice in which two developers work together at one workstation: a driver who writes code and a navigator who reviews.Foundational
- Parametric EstimatingTechnique using an algorithm or statistical relationship between historical data and variables to calculate estimates.Foundational
- Pareto ChartA bar chart sorted in descending order of frequency with a cumulative percentage line, used to identify the vital few causes.Foundational
- Parkinson's LawThe observation that work expands to fill the time available for its completion.Intermediate
- Participatory BudgetingSAFe forum in which stakeholders collaboratively decide how to allocate the portfolio budget across value streams.Advanced
- Payback PeriodThe length of time required to recover the initial investment from net cash inflows.Foundational
- Percent Complete RulesConventions for claiming earned value on work packages, such as 0/100, 50/50, and 20/80.Advanced
- Perform Qualitative Risk AnalysisProcess of prioritizing individual project risks by assessing their probability of occurrence and impact.Foundational
- Perform Quantitative Risk AnalysisProcess of numerically analyzing the combined effect of identified risks and other sources of uncertainty on overall project objectives.Advanced
- Performance DomainA group of related activities critical to the effective delivery of project outcomes, as defined in the PMBOK Guide.Intermediate
- Performance Measurement Baseline (PMB)Integrated scope, schedule, and cost baselines used for comparison to manage, measure, and control project execution.Intermediate
- PersonaA fictional, research-based archetype representing a user group's goals, behaviors, and pain points.Foundational
- PESTLE AnalysisFramework examining Political, Economic, Social, Technological, Legal, and Environmental factors affecting an initiative.Foundational
- Phase GateA review at the end of a phase to decide whether to continue, modify, or end the project or program.Foundational
- PI ObjectivesSummaries of business and technical goals that a team or ART intends to achieve in the upcoming Planning Interval.Intermediate
- PI PlanningCadence-based, face-to-face (or remote) event where all teams on an ART plan together for the next Planning Interval.Foundational
- Plan Risk ResponsesProcess of developing options, selecting strategies, and agreeing on actions to address overall and individual project risks.Foundational
- Planned Value (PV)The authorized budget assigned to scheduled work.Foundational
- Planning Interval (PI)In SAFe, a cadence-based timebox, typically 8-12 weeks, in which an ART delivers incremental value.Foundational
- Planning PackageA WBS component below the control account with known work content but without detailed schedule activities.Advanced
- Planning PokerConsensus-based estimation technique in which team members privately select cards and reveal them simultaneously.Foundational
- Point of Total Assumption (PTA)In a fixed price incentive fee contract, the cost point above which the seller bears all cost overruns.Advanced
- Poka-YokeLean technique of mistake-proofing a process so errors are prevented or immediately detected.Intermediate
- PortfolioA collection of projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.Foundational
- Portfolio KanbanSAFe system for visualizing and managing the flow of epics from ideation through analysis and implementation.Advanced
- Portfolio ManagementCentralized management of one or more portfolios to achieve strategic objectives.Intermediate
- Power TypesSources of influence a project manager can use: formal (legitimate), reward, coercive (penalty), expert, and referent.Intermediate
- Power/Interest GridA stakeholder mapping tool that classifies stakeholders by level of authority (power) and concern (interest).Foundational
- Precedence Diagramming Method (PDM)Technique for constructing a schedule model in which activities are represented by nodes and linked by logical relationships.Intermediate
- Precision vs. AccuracyPrecision is consistency of repeated measurements; accuracy is closeness of a measurement to the true value.Intermediate
- Predictive ApproachA development approach in which scope, schedule, and cost are determined in detail early in the life cycle.Foundational
- Present ValueThe current worth of a future sum discounted at a given rate: PV = FV / (1 + r)^n.Intermediate
- Preventive ActionAn intentional activity that ensures the future performance of project work is aligned with the plan.Foundational
- PRINCE2Process-based project management method (PRojects IN Controlled Environments) owned by PeopleCert (AXELOS).Foundational
- PRINCE2 PracticesThe seven aspects of project management that must be addressed continually: business case, organizing, plans, quality, risk, issues, and progress.Foundational
- PRINCE2 PrinciplesThe seven universal PRINCE2 principles, from continued business justification to tailoring, that must all be applied in a PRINCE2 project.Foundational
- PRINCE2 ProcessesThe seven PRINCE2 processes, from Starting up a Project through Closing a Project, that describe who does what across the life cycle.Foundational
- Privity of ContractLegal principle that only the parties to a contract have rights and obligations under it.Advanced
- Probability and Impact MatrixA grid that maps the probability of each risk against its impact on objectives to prioritize risks.Foundational
- Process CapabilityThe ability of a stable process to produce output within specification limits, measured by indices such as Cp and Cpk.Advanced
- Process GroupA logical grouping of project management processes: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.Foundational
- Process ModelingTechnique using standardized graphical models to show how work is carried out.Foundational
- Procurement AuditStructured review of the procurement process from planning through closure to identify successes and failures.Advanced
- Procurement Statement of Work (SOW)A description of the procurement item in sufficient detail to allow prospective sellers to determine if they can provide it.Foundational
- Product AnalysisTechnique for asking questions about a product to translate high-level descriptions into tangible deliverables.Intermediate
- Product BacklogAn emergent, ordered list of what is needed to improve the product; the single source of work undertaken by the Scrum Team.Foundational
- Product Backlog RefinementThe ongoing act of breaking down and adding detail, such as description, order, and size, to Product Backlog items.Foundational
- Product Breakdown Structure (PBS)PRINCE2 hierarchy of all products to be produced during a plan.Intermediate
- Product DescriptionPRINCE2 management product describing a product's purpose, composition, derivation, quality criteria, and quality method.Intermediate
- Product DiscoveryActivities that determine what to build by validating that solutions are valuable, usable, feasible, and viable before full delivery.Intermediate
- Product Flow Diagram (PFD)PRINCE2 diagram showing the sequence of production and interdependencies of products in a PBS.Advanced
- Product GoalThe future state of the product that serves as a target for the Scrum Team to plan against.Foundational
- Product Owner (PO)The Scrum accountability for maximizing the value of the product resulting from the Scrum Team's work.Foundational
- Product RoadmapA high-level, time-based view of how a product is expected to evolve toward its vision.Foundational
- Product ScopeThe features and functions that characterize a product, service, or result.Foundational
- Product VisionA concise statement describing the long-term purpose and desired future the product aims to create.Foundational
- ProgramA group of related projects, subsidiary programs, and activities managed in a coordinated way to obtain benefits not available individually.Foundational
- Program Evaluation and Review Technique (PERT)Estimating and scheduling technique using weighted average durations (O + 4M + P) / 6.Intermediate
- Program ManagementApplication of knowledge, skills, and principles to a program to achieve its objectives and benefits.Intermediate
- Progressive ElaborationThe iterative process of increasing the level of detail in a plan as more information and more accurate estimates become available.Foundational
- ProjectA temporary endeavor undertaken to create a unique product, service, or result.Foundational
- Project AssurancePRINCE2 function independent of the Project Manager that monitors project performance on behalf of Project Board members.Intermediate
- Project BoardPRINCE2 group accountable for the project's success, consisting of the Executive, Senior User(s), and Senior Supplier(s).Foundational
- Project BriefPRINCE2 statement describing the purpose, cost, time, performance requirements, and constraints for a project, created in Starting up a Project.Intermediate
- Project BudgetThe total funds authorized for the project, consisting of the cost baseline plus management reserves.Intermediate
- Project BufferIn critical chain scheduling, a buffer placed at the end of the critical chain to protect the target finish date.Advanced
- Project CharterA document issued by the sponsor that formally authorizes the project and gives the project manager authority to apply resources.Foundational
- Project Cost ManagementProcesses involved in planning, estimating, budgeting, financing, managing, and controlling costs to complete the project within budget.Foundational
- Project DocumentsRecords used to manage the project that are not part of the project management plan.Intermediate
- Project FloatThe amount of time a project can be delayed without delaying an externally imposed end date.Intermediate
- Project Funding RequirementsTotal and periodic funding needs derived from the cost baseline, often in incremental, non-continuous amounts.Advanced
- Project Initiation Documentation (PID)PRINCE2 set of documents bringing together key information needed to start the project on a sound basis.Foundational
- Project Integration ManagementProcesses and activities that identify, define, combine, unify, and coordinate project management activities.Foundational
- Project Kickoff MeetingA meeting at the start of planning or execution that communicates objectives, gains commitment, and explains stakeholder roles.Foundational
- Project Life CycleThe series of phases a project passes through from its start to its completion.Foundational
- Project Management Office (PMO)An organizational structure that standardizes project governance and facilitates sharing of resources, methods, tools, and techniques.Foundational
- Project Management PlanThe document that describes how the project will be executed, monitored and controlled, and closed.Foundational
- Project Management PrinciplesFundamental norms that guide behavior of project practitioners, as listed in the PMBOK Guide.Intermediate
- Project Manager (PM)The person assigned by the performing organization to lead the team responsible for achieving project objectives.Foundational
- Project MandatePRINCE2 trigger from the commissioning organization that initiates the Starting up a Project process.Intermediate
- Project MilestoneA significant point or event in a project, program, or portfolio with zero duration.Foundational
- Project Procurement ManagementProcesses necessary to purchase or acquire products, services, or results from outside the project team.Foundational
- Project Product DescriptionPRINCE2 description of the project's main output, including customer quality expectations and acceptance criteria.Intermediate
- Project Quality ManagementProcesses for incorporating quality policy into planning, managing, and controlling project and product quality requirements.Foundational
- Project Schedule ManagementProcesses required to manage the timely completion of the project.Foundational
- Project Schedule Network DiagramGraphical representation of the logical relationships among project schedule activities.Foundational
- Project ScopeThe work performed to deliver a product, service, or result with the specified features and functions.Foundational
- Project Scope ManagementProcesses that ensure the project includes all the work required, and only the work required, to complete successfully.Foundational
- Project SponsorThe person or group that provides resources and support for the project and is accountable for enabling success.Foundational
- Project Stakeholder ManagementProcesses to identify, analyze, engage, and monitor people or organizations that can affect or be affected by the project.Foundational
- Prompt ListA predetermined list of risk categories used to prompt identification of individual and overall project risks.Intermediate
- PrototypeAn early working model of a product used to obtain feedback before building the real thing.Foundational
- Psychological SafetyA shared belief that the team is safe for interpersonal risk-taking such as speaking up, admitting mistakes, or asking questions.Intermediate
- Pull SystemA system in which work is pulled into a stage only when capacity is available, rather than pushed.Foundational
- Quality AuditA structured, independent review of whether project activities comply with organizational and project policies and procedures.Intermediate
- Quality RegisterPRINCE2 record summarizing all planned and completed quality management activities.Advanced
- Regression AnalysisStatistical technique modeling the relationship between a dependent variable and one or more independent variables.Advanced
- Relative EstimationEstimating items by comparing them to each other rather than in absolute units.Foundational
- Release on DemandSAFe practice of releasing value to customers when the business needs it, decoupled from deployment cadence.Advanced
- Release PlanningPlanning activity that determines which features or stories will be delivered in upcoming releases.Intermediate
- Release Train Engineer (RTE)SAFe servant leader and coach for the Agile Release Train who facilitates ART events and processes.Intermediate
- Request for Change (RFC)PRINCE2 issue type proposing a change to a baseline.Intermediate
- Requirements Classification SchemaBABOK classification of requirements as business, stakeholder, solution (functional and non-functional), and transition requirements.Foundational
- Requirements DocumentationDescription of how individual requirements meet the business need for the project.Foundational
- Requirements Life Cycle ManagementBABOK knowledge area covering tracing, maintaining, prioritizing, assessing changes to, and approving requirements and designs.Intermediate
- Requirements Management PlanComponent of the project management plan describing how requirements will be analyzed, documented, and managed.Intermediate
- Requirements ValidationEnsuring requirements align with business requirements and deliver value to stakeholders.Intermediate
- Requirements VerificationChecking that requirements and designs are of sufficient quality: complete, consistent, unambiguous, testable, and feasible.Intermediate
- Requirements WorkshopStructured, facilitated meeting of key stakeholders to define, refine, prioritize, or reach closure on requirements.Foundational
- Reserve AnalysisTechnique comparing the remaining contingency reserves to the remaining risk to determine whether reserves are adequate.Intermediate
- Resource HistogramA bar chart showing the amount of time a resource is scheduled to work over a series of periods.Intermediate
- Resource LevelingResource optimization technique that adjusts start and finish dates to balance resource demand with supply.Intermediate
- Resource Management PlanComponent of the project management plan describing how team and physical resources are acquired, allocated, managed, and released.Foundational
- Resource SmoothingResource optimization technique that adjusts activities within their float so resource requirements stay within limits without changing the critical path.Intermediate
- Responsibility Assignment Matrix (RAM)A grid that shows the project resources assigned to each work package or activity.Foundational
- Retrospective TechniquesFacilitation formats for running retrospectives, such as Start-Stop-Continue, Sailboat, 4Ls, and Mad-Sad-Glad.Intermediate
- Return on Investment (ROI)Ratio of net benefit to cost: (gain - cost) / cost, expressed as a percentage.Foundational
- Risk AttitudeThe disposition of an individual or organization toward uncertainty, such as risk-averse, risk-neutral, or risk-seeking.Intermediate
- Risk AuditAn examination of the effectiveness of the risk management process and risk responses.Advanced
- Risk Breakdown Structure (RBS)A hierarchical representation of potential sources of risk.Intermediate
- Risk Data Quality AssessmentTechnique for evaluating the accuracy, reliability, and integrity of data about individual risks.Advanced
- Risk Management PlanComponent of the project management plan describing how risk management activities will be structured and performed.Foundational
- Risk Priority Number (RPN)FMEA score calculated as severity x occurrence x detection.Intermediate
- Risk ReportProject document summarizing information on individual project risks and the level of overall project risk.Intermediate
- Risk TriggerAn event or condition indicating that a risk is about to occur or has occurred.Foundational
- Risk UrgencyA risk parameter indicating how soon a response must be implemented to be effective.Advanced
- ROAMSAFe technique for categorizing risks during PI Planning: Resolved, Owned, Accepted, or Mitigated.Intermediate
- Rolled Throughput Yield (RTY)Probability that a unit passes through all process steps defect-free: the product of each step's first-pass yield.Advanced
- Rolling Wave PlanningIterative planning technique in which near-term work is planned in detail while future work is planned at a higher level.Intermediate
- Rough Order of Magnitude Estimate (ROM)An early, low-accuracy estimate typically in the range of -25% to +75%.Foundational
- Rule of SevenControl chart heuristic: seven consecutive data points on one side of the mean indicate a non-random pattern.Intermediate
- S-CurveGraph of cumulative costs, labor hours, or other quantities plotted against time, typically shaped like an S.Intermediate
- Salience ModelStakeholder classification model based on power, urgency, and legitimacy.Advanced
- Scaled Agile Framework (SAFe)A knowledge base of integrated principles, practices, and competencies for applying Lean, Agile, and DevOps at enterprise scale.Foundational
- Scatter DiagramA graph plotting pairs of numerical data to show the relationship between two variables.Foundational
- Schedule BaselineThe approved version of the schedule model, changeable only through formal change control, used as a basis for comparison.Foundational
- Schedule CompressionTechniques used to shorten schedule duration without reducing scope.Intermediate
- Schedule Management PlanComponent of the project management plan establishing criteria and activities for developing, monitoring, and controlling the schedule.Intermediate
- Schedule ModelA representation of the plan for executing activities, including durations, dependencies, and other planning information.Advanced
- Schedule Performance Index (SPI)Measure of schedule efficiency: SPI = EV / PV.Foundational
- Schedule Variance (SV)Measure of schedule performance: SV = EV - PV.Foundational
- Scope BaselineThe approved version of a scope statement, WBS, and WBS dictionary, changeable only through formal change control.Foundational
- Scope Management PlanComponent of the project management plan describing how scope will be defined, developed, monitored, controlled, and validated.Intermediate
- Scope StatementDescription of the project scope, major deliverables, assumptions, constraints, and exclusions.Foundational
- ScrumA lightweight framework that helps people, teams, and organizations generate value through adaptive solutions for complex problems.Foundational
- Scrum ArtifactsThe Product Backlog, Sprint Backlog, and Increment, each with a commitment.Foundational
- Scrum EventsThe Sprint, Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective.Foundational
- Scrum GuideThe official definition of Scrum written by Ken Schwaber and Jeff Sutherland; the current edition was published in November 2020.Foundational
- Scrum Master (SM)The Scrum accountability for establishing Scrum as defined in the Scrum Guide and for the Scrum Team's effectiveness.Foundational
- Scrum of ScrumsA coordination technique in which representatives from multiple Scrum teams meet to manage dependencies.Intermediate
- Scrum PillarsTransparency, inspection, and adaptation: the three pillars of Scrum's empirical process control.Foundational
- Scrum TeamA small, cohesive, self-managing unit of one Scrum Master, one Product Owner, and Developers.Foundational
- Scrum ValuesCommitment, Focus, Openness, Respect, and Courage.Foundational
- ScrumbanA hybrid of Scrum and Kanban practices.Intermediate
- Secondary RiskA risk that arises as a direct result of implementing a risk response.Intermediate
- Self-Managing TeamA team that internally decides who does what, when, and how.Foundational
- Senior SupplierPRINCE2 Project Board role representing those designing, developing, and implementing the project's products.Intermediate
- Senior UserPRINCE2 Project Board role representing those who will use the project's products and realize benefits.Intermediate
- Sensitivity AnalysisQuantitative technique that determines which individual risks or uncertainties have the most potential impact on outcomes.Advanced
- Sequence ActivitiesProcess of identifying and documenting relationships among project activities.Foundational
- Servant LeadershipLeadership style that focuses on understanding and addressing team members' needs and development to enable high performance.Foundational
- Seven Basic Quality ToolsClassic quality tools: cause-and-effect diagram, flowchart, check sheet, Pareto chart, histogram, control chart, and scatter diagram.Foundational
- Seven Patterns of AICPMAI classification of AI use cases into seven patterns, used to clarify data needs, approach, and success criteria.Intermediate
- Share (Risk Response)Opportunity response that allocates ownership of an opportunity to a third party best able to capture it.Intermediate
- Sigma LevelA measure of process capability expressing how many standard deviations fit between the mean and nearest specification limit.Advanced
- Single-Minute Exchange of Die (SMED)Lean method for reducing setup or changeover time to under ten minutes.Advanced
- SIPOCHigh-level process map listing Suppliers, Inputs, Process, Outputs, and Customers.Foundational
- Situational LeadershipLeadership model in which the leader adapts style (directing, coaching, supporting, delegating) to followers' competence and commitment.Intermediate
- Six SigmaData-driven quality methodology aiming to reduce process variation to no more than 3.4 defects per million opportunities.Foundational
- Six Sigma BeltsRole structure in Six Sigma: Champion, Master Black Belt, Black Belt, Green Belt, Yellow Belt, and White Belt.Foundational
- Solution EvaluationBABOK knowledge area assessing the performance and value delivered by a solution in use and recommending actions to increase value.Intermediate
- Solution TrainSAFe organizational construct coordinating multiple ARTs and suppliers to build large, complex solutions.Advanced
- Source Selection CriteriaAttributes the buyer uses to evaluate and select sellers.Intermediate
- Special Cause VariationVariation arising from specific, assignable causes outside the normal process.Intermediate
- Specification LimitsCustomer- or engineering-defined boundaries (USL and LSL) for acceptable output.Intermediate
- SpikeA timeboxed research or prototyping effort to reduce uncertainty or answer a technical question.Foundational
- SprintA fixed-length event of one month or less in which ideas are turned into value.Foundational
- Sprint BacklogThe Sprint Goal (why), the set of Product Backlog items selected for the Sprint (what), and an actionable plan for delivering the Increment (how).Foundational
- Sprint CancellationEnding a Sprint early because its Sprint Goal has become obsolete.Intermediate
- Sprint GoalThe single objective for the Sprint, created during Sprint Planning and added to the Sprint Backlog.Foundational
- Sprint PlanningScrum event that initiates the Sprint by laying out the work to be performed.Foundational
- Sprint RetrospectiveScrum event to plan ways to increase quality and effectiveness.Foundational
- Sprint ReviewScrum event to inspect the outcome of the Sprint and determine future adaptations.Foundational
- Stacey MatrixModel plotting agreement on requirements against certainty about technology to classify work as simple, complicated, complex, or anarchic.Intermediate
- StakeholderAn individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a project.Foundational
- Stakeholder AnalysisTechnique of systematically gathering and analyzing information to determine whose interests should be considered.Foundational
- Stakeholder CubeA three-dimensional refinement of grid models combining stakeholder dimensions such as power, interest, and attitude.Advanced
- Stakeholder Engagement Assessment MatrixA matrix comparing current and desired stakeholder engagement levels.Intermediate
- Stakeholder Engagement PlanComponent of the project management plan identifying strategies and actions to promote productive stakeholder involvement.Intermediate
- Stakeholder RegisterProject document containing identification, assessment, and classification of project stakeholders.Foundational
- Standard Deviation (PERT)Measure of estimate uncertainty calculated as (Pessimistic - Optimistic) / 6.Advanced
- Statistical Process Control (SPC)Use of statistical methods, chiefly control charts, to monitor and control a process.Advanced
- Status ReportPeriodic report describing where the project currently stands on scope, schedule, cost, risks, and issues.Foundational
- Story MappingTechnique by Jeff Patton that arranges user stories along a user journey (backbone) and by priority (vertical) to plan releases.Intermediate
- Story PointsA unit of relative estimation representing the effort, complexity, and uncertainty of a backlog item.Foundational
- Story SplittingBreaking a large user story into smaller stories that each still deliver value.Intermediate
- Strategic GoalIn EBM, an important, ambitious long-term goal the organization aims to achieve, often with uncertain paths.Advanced
- Strategy AnalysisBABOK knowledge area focused on defining the business need, current state, future state, risks, and change strategy.Intermediate
- Student SyndromeTendency to delay starting work until just before a deadline.Intermediate
- Sunk CostMoney already spent that cannot be recovered.Foundational
- Sustainable PaceWorking at a pace the team can maintain indefinitely without burnout.Foundational
- SwarmingMultiple team members working together on one item to finish it faster.Intermediate
- Swimlane DiagramA process diagram that divides activities into lanes by role, department, or system.Foundational
- SWOT AnalysisAnalysis of Strengths, Weaknesses, Opportunities, and Threats of an organization, project, or option.Foundational
- System DemoSAFe event that demonstrates the integrated work of all teams on an ART at the end of each iteration.Intermediate
- T-Shaped SkillsDeep expertise in one area combined with broad ability to contribute in other areas.Intermediate
- T-Shirt SizingRelative estimation technique using sizes such as XS, S, M, L, and XL.Foundational
- Tacit KnowledgePersonal knowledge such as beliefs, insights, experience, and know-how that is difficult to articulate and share.Intermediate
- Tailor to Suit the ProjectPRINCE2 principle that the method is adapted to the project's environment, size, complexity, importance, capability, and risk.Intermediate
- TailoringDeliberate adaptation of the approach, governance, and processes to suit the project's context.Intermediate
- Takt TimeThe rate at which products must be completed to meet customer demand: available production time divided by customer demand.Intermediate
- Team CharterDocument recording team values, agreements, and operating guidelines.Foundational
- Theory of Constraints (TOC)Management philosophy by Eliyahu Goldratt holding that every system is limited by at least one constraint.Advanced
- Three-Point EstimatingTechnique that uses optimistic, most likely, and pessimistic estimates to account for uncertainty.Foundational
- Time and Materials Contract (T&M)Hybrid contract with elements of fixed-price (unit rates) and cost-reimbursable (open total value).Foundational
- Time to Market (T2M)EBM Key Value Area expressing how quickly the organization can deliver new capabilities and learn from them.Advanced
- TimeboxA fixed, maximum period of time for an activity or event.Foundational
- To-Complete Performance Index (TCPI)The cost efficiency required on remaining work to meet a target: TCPI = (BAC - EV) / (BAC - AC), or (BAC - EV) / (EAC - AC).Advanced
- ToleranceThe permissible deviation above and below a plan's target before escalation is needed.Intermediate
- Tornado DiagramA bar chart used in sensitivity analysis that ranks variables by their effect on an outcome, with the largest at the top.Advanced
- Total FloatThe amount of time an activity can be delayed from its early start without delaying the project finish date or violating a schedule constraint.Foundational
- Transition RequirementsTemporary requirements describing capabilities needed to transition from the current state to the future state.Intermediate
- Trend AnalysisTechnique examining project results over time to determine whether performance is improving or deteriorating.Foundational
- Triple ConstraintThe classic model that scope, time, and cost are interdependent, with quality affected by all three.Foundational
- Tuckman LadderModel of team development stages: forming, storming, norming, performing, and adjourning.Foundational
- Unrealized Value (UV)EBM Key Value Area showing potential future value the product could capture.Advanced
- Usability TestingEvaluating a product by observing representative users attempting real tasks.Foundational
- User StoryA short description of functionality told from the user's perspective, typically 'As a <role>, I want <goal>, so that <benefit>'.Foundational
- Validate ScopeProcess of formalizing acceptance of completed project deliverables.Foundational
- Value Delivery SystemStrategic business activities that build, sustain, and advance an organization through portfolios, programs, projects, and operations.Intermediate
- Value Engineering (VE)Systematic approach to finding less costly ways to complete the same work while preserving function.Intermediate
- Vanity MetricsMetrics that look impressive but do not inform decisions or reflect real value.Intermediate
- Variance AnalysisTechnique for determining the cause and degree of difference between baseline and actual performance.Foundational
- Variance at Completion (VAC)Projected budget deficit or surplus at project end: VAC = BAC - EAC.Intermediate
- VelocityThe amount of work, usually in story points, a team completes per iteration.Foundational
- Verified DeliverablesCompleted project deliverables checked and confirmed for correctness through Control Quality.Foundational
- Vertical SliceA piece of functionality that cuts through all architectural layers to deliver end-to-end value.Intermediate
- Virtual TeamA group of people with shared goals who fulfill roles with little or no time spent meeting face to face.Foundational
- Visual ManagementLean practice of making work, standards, and abnormalities visible at a glance.Foundational
- Voice of the Customer (VOC)Process of capturing customer needs, expectations, and preferences.Foundational
- Watch ListA list of low-priority risks recorded for monitoring rather than active response.Intermediate
- Waterfall ModelA sequential life cycle where each phase is completed before the next begins.Foundational
- WBS DictionaryDocument providing detailed deliverable, activity, and scheduling information about each component in the WBS.Foundational
- Weighted Scoring ModelSelection method that rates options on criteria, multiplies by weights, and sums the scores.Foundational
- Weighted Shortest Job First (WSJF)Prioritization model that sequences jobs to produce maximum economic benefit: Cost of Delay divided by job duration (or job size).Intermediate
- Western Electric RulesSet of decision rules for detecting non-random patterns on control charts.Advanced
- Wideband DelphiConsensus estimation technique in which experts estimate anonymously, discuss differences, and iterate.Intermediate
- WIP LimitA constraint on the number of work items allowed in a workflow state or system at one time.Foundational
- Work Breakdown Structure (WBS)A hierarchical decomposition of the total scope of work to be carried out by the team to accomplish objectives and create deliverables.Foundational
- Work in Progress (WIP)Work items that have started but are not yet finished.Foundational
- Work Item AgeThe elapsed time since an item started that is still in progress.Intermediate
- Work PackageThe work defined at the lowest level of the WBS for which cost and duration can be estimated and managed.Foundational
- Work Performance Data (WPD)Raw observations and measurements identified during activities performed to carry out project work.Intermediate
- Work Performance Information (WPI)Performance data collected from controlling processes and analyzed in comparison with plan components and baselines.Intermediate
- Work Performance ReportsThe physical or electronic representation of work performance information compiled to generate decisions or awareness.Intermediate