PMI Project Management Professional (PMP): key terms
345 terms you need to know for PMI Project Management Professional (PMP) (PMP). Filter by level, then drill them with flashcards.
Flashcards for this exam PMI Project Management Professional (PMP) guide Class dates
- 100 Percent RuleWBS principle that the WBS includes all the work of the project, including project management, and nothing more.Intermediate
- A Guide to the Project Management Body of Knowledge (PMBOK Guide)PMI's foundational standard and guide describing project management principles, performance domains, and practices.Foundational
- Acceptance CriteriaConditions a product or backlog item must satisfy to be accepted by the product owner or customer.Foundational
- Accepted DeliverablesProducts, results, or capabilities produced by a project and validated by the customer or sponsor as meeting acceptance criteria.Foundational
- ActivityA distinct, scheduled portion of work performed during the course of a project.Foundational
- Actual CostThe realized cost incurred for the work performed on an activity during a specific time period.Foundational
- Adaptive ApproachA development approach in which requirements are elaborated and refined iteratively as the project proceeds.Foundational
- Affinity DiagramTechnique for organizing a large number of ideas into groups based on natural relationships.Foundational
- Agile ContractingContract approaches that accommodate changing scope while managing buyer and seller risk.Advanced
- Agile ManifestoThe 2001 Manifesto for Agile Software Development, stating four values and twelve principles.Foundational
- Agile Practice GuidePMI and Agile Alliance guide on applying agile approaches, published with PMBOK 6 in 2017.Intermediate
- Agile PrinciplesThe twelve principles behind the Agile Manifesto.Foundational
- Alternative Dispute Resolution (ADR)Methods such as mediation and arbitration used to resolve contract disputes without litigation.Intermediate
- Analogous EstimatingTechnique for estimating duration or cost using historical data from a similar activity or project.Foundational
- AssumptionA factor in the planning process that is considered true, real, or certain without proof or demonstration.Foundational
- Assumption LogA project document used to record all assumptions and constraints throughout the project life cycle.Foundational
- Backward PassCPM calculation of late start and late finish dates moving from project end to start.Intermediate
- Basis of EstimatesSupporting documentation describing how an estimate was derived.Intermediate
- Benefit-Cost Ratio (BCR)Ratio of the present value of benefits to the present value of costs.Intermediate
- Benefits Management PlanDocument describing how and when project benefits will be delivered and measured.Intermediate
- Benefits RealizationThe practice of ensuring that the outcomes of projects and programs produce measurable benefits for the organization.Intermediate
- Bid DocumentsDocuments used to solicit information, quotations, or proposals from prospective sellers.Foundational
- Bidder ConferenceMeetings with prospective sellers before proposal submission to ensure all have a clear, common understanding of the procurement.Intermediate
- Bottom-Up EstimatingMethod of estimating by aggregating estimates of lower-level WBS components.Foundational
- BrainstormingGroup technique for generating many ideas in a short time without initial criticism.Foundational
- Budget at Completion (BAC)The sum of all budgets established for the work to be performed.Foundational
- Budget EstimateAn estimate prepared during planning with an accuracy range often cited as -10% to +25%.Intermediate
- Burndown ChartChart showing remaining work versus time in an iteration or release.Foundational
- Burnup ChartChart showing completed work rising over time against a separate total scope line.Foundational
- Business CaseDocumented justification for an investment, describing benefits, costs, risks, and alignment with objectives.Intermediate
- Change Control Board (CCB)A formally constituted group responsible for reviewing, evaluating, approving, deferring, or rejecting changes to the project.Foundational
- Change LogA comprehensive list of changes submitted during the project and their current status.Foundational
- Change Management PlanComponent of the project management plan establishing the change control board, its authority, and how change control will be administered.Intermediate
- Change Request (CR)A formal proposal to modify a document, deliverable, or baseline.Foundational
- Check SheetA structured form for collecting data in real time at the location where it is generated.Foundational
- Claims AdministrationProcess of documenting, processing, monitoring, and managing contested changes and disputes between buyer and seller.Advanced
- Close Project or PhaseProcess of finalizing all activities for the project, phase, or contract.Foundational
- Cognitive Project Management for AI (CPMAI)Vendor-neutral, data-centric, iterative methodology for running AI and machine learning projects, now offered by PMI as PMI-CPMAI.Intermediate
- Collect RequirementsProcess of determining, documenting, and managing stakeholder needs and requirements to meet objectives.Foundational
- ColocationPlacing many or all active team members in the same physical location to enhance teamwork.Foundational
- Common Cause VariationNatural, inherent variation in a stable process due to many small random factors.Intermediate
- Communication ChannelsThe number of potential communication paths among project stakeholders: n(n - 1) / 2.Foundational
- Communication MethodsThe approaches for sharing information: interactive, push, and pull.Foundational
- Communication ModelModel describing how information is exchanged between sender and receiver, including encoding, transmitting, decoding, acknowledging, and feedback.Intermediate
- Communications Management PlanComponent of the project management plan describing how, when, and by whom information will be administered and disseminated.Foundational
- Conduct ProcurementsProcess of obtaining seller responses, selecting a seller, and awarding a contract.Intermediate
- Cone of UncertaintyConcept that estimate uncertainty is greatest early in a project and narrows as information is gained.Intermediate
- Configuration Management PlanComponent of the project management plan describing how to identify, account for, and control versions of configurable items.Intermediate
- Conflict ManagementApproaches to resolving disagreements: withdraw/avoid, smooth/accommodate, compromise/reconcile, force/direct, and collaborate/problem-solve.Foundational
- ConstraintA limiting factor that affects the execution of a project, program, portfolio, or process.Foundational
- Context DiagramA scope model showing a system and the external entities that interact with it, with inputs and outputs.Foundational
- Contingency PlanA predefined response to implement if a risk trigger occurs.Intermediate
- Contingency ReserveTime or money allocated in the baseline for identified risks with planned responses ('known-unknowns').Foundational
- Contract TypesCategories of agreements that allocate risk between buyer and seller: fixed-price, cost-reimbursable, and time and materials.Foundational
- Control AccountA management control point where scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement.Advanced
- Control ChartA graph showing process data over time against a mean and upper and lower control limits to determine whether a process is stable.Foundational
- Control ProcurementsProcess of managing procurement relationships, monitoring contract performance, making changes, and closing contracts.Intermediate
- Control QualityProcess of monitoring and recording quality activity results to ensure outputs are complete, correct, and meet expectations.Intermediate
- Control ScheduleProcess of monitoring project status to update the schedule and manage changes to the schedule baseline.Intermediate
- Control ScopeProcess of monitoring the status of project and product scope and managing changes to the scope baseline.Foundational
- Cost BaselineThe approved, time-phased budget of the project, excluding management reserves.Foundational
- Cost of Poor Quality (COPQ)Costs that would disappear if every activity were performed without defects.Intermediate
- Cost of Quality (COQ)All costs of preventing nonconformance, appraising conformance, and failing to meet requirements over the product life.Foundational
- Cost Performance Index (CPI)Measure of cost efficiency of budgeted resources: CPI = EV / AC.Foundational
- Cost Plus Award Fee Contract (CPAF)Cost-reimbursable contract in which the fee is based on a subjective evaluation of performance by the buyer.Advanced
- Cost Plus Fixed Fee Contract (CPFF)Cost-reimbursable contract in which the seller is reimbursed allowable costs plus a fixed fee calculated on initial estimated costs.Intermediate
- Cost Plus Incentive Fee Contract (CPIF)Cost-reimbursable contract where the seller gets allowable costs plus an incentive fee based on achieving performance objectives.Advanced
- Cost Variance (CV)The amount of budget deficit or surplus at a point in time: CV = EV - AC.Foundational
- Crash Cost per DayThe incremental cost of shortening an activity by one time unit: (crash cost - normal cost) / (normal time - crash time).Advanced
- CrashingSchedule compression technique that shortens duration by adding resources, usually at increased cost.Intermediate
- Create WBSProcess of subdividing project deliverables and work into smaller, more manageable components.Foundational
- Critical Chain Method (CCM)Scheduling method that accounts for limited resources and uses buffers to protect the project end date.Advanced
- Critical PathThe sequence of activities that represents the longest path through a project and determines the shortest possible duration.Foundational
- Critical Path Method (CPM)Method used to estimate the minimum project duration and determine schedule flexibility on logical network paths.Foundational
- Cross-Functional TeamA team whose members collectively have all skills necessary to create value each iteration.Foundational
- Cumulative Flow Diagram (CFD)Stacked area chart showing the number of work items in each workflow state over time.Intermediate
- Cycle TimeThe elapsed time from when work starts on an item to when it finishes.Foundational
- Cynefin FrameworkSense-making framework by Dave Snowden classifying situations as clear, complicated, complex, chaotic, or confused.Intermediate
- Data DateThe point in time when the status of the project is recorded.Advanced
- Decision Tree AnalysisDiagramming and calculation technique for evaluating alternative choices under uncertainty using expected monetary value.Advanced
- Decision-Making TechniquesGroup methods for reaching decisions, such as unanimity, majority, plurality, autocratic, fist of five, and Roman voting.Intermediate
- DecompositionTechnique for dividing and subdividing scope and deliverables into smaller, more manageable parts.Foundational
- Defect RepairAn intentional activity to modify a nonconforming product or product component.Foundational
- Define ActivitiesProcess of identifying and documenting the specific actions to be performed to produce deliverables.Foundational
- Define ScopeProcess of developing a detailed description of the project and product.Foundational
- Definitive EstimateA detailed, high-accuracy estimate typically in the range of -5% to +10%.Intermediate
- Delphi TechniqueStructured, anonymous, iterative method for reaching expert consensus, often used in qualitative risk analysis.Intermediate
- Dependency TypesClassification of activity dependencies as mandatory, discretionary, external, or internal.Intermediate
- Design for X (DfX)Technical guidelines applied during design to optimize a specific aspect such as reliability, cost, assembly, or usability.Advanced
- Design of Experiments (DOE)Statistical method for determining which factors and interactions affect a process output.Advanced
- Determine BudgetProcess of aggregating estimated costs of activities or work packages to establish an authorized cost baseline.Intermediate
- Develop Project CharterProcess of creating the document that formally authorizes the project's existence.Foundational
- Develop ScheduleProcess of analyzing activity sequences, durations, resources, and constraints to create the schedule model.Intermediate
- Develop TeamProcess of improving competencies, team interaction, and the team environment to enhance performance.Intermediate
- Direct and Indirect CostsDirect costs are attributable directly to the project; indirect costs are shared overhead allocated across projects.Foundational
- Direct and Manage Project WorkProcess of leading and performing the work defined in the plan and implementing approved changes.Intermediate
- Disciplined Agile (DA)PMI's hybrid, tool-kit approach that helps teams choose their way of working (WoW) based on context.Advanced
- Discrete EffortWork that can be planned and measured and that yields a specific output.Advanced
- Document AnalysisElicitation technique of reviewing existing documentation to understand context and requirements.Foundational
- Earned Schedule (ES)Extension of EVM that measures schedule performance in time units rather than currency.Advanced
- Earned Value (EV)The measure of work performed expressed in terms of the budget authorized for that work.Foundational
- Earned Value Management (EVM)Methodology that integrates scope, schedule, and resources to objectively measure project performance and progress.Foundational
- ElicitationDrawing out, exploring, and identifying information relevant to a change from stakeholders and other sources.Foundational
- Emotional Intelligence (EI)The ability to identify, assess, and manage one's own emotions and those of others and groups.Foundational
- Enhance (Risk Response)Opportunity response that increases the probability and/or impact of an opportunity.Intermediate
- Enterprise Environmental Factors (EEF)Conditions, not under the immediate control of the team, that influence, constrain, or direct the project.Foundational
- Escalate (Risk Response)Risk response in which a threat or opportunity outside the project's scope or authority is passed to a higher level.Intermediate
- Estimate Activity DurationsProcess of estimating the number of work periods needed to complete individual activities with estimated resources.Foundational
- Estimate at Completion (EAC)The expected total cost of completing all work: commonly EAC = AC + ETC.Intermediate
- Estimate CostsProcess of developing an approximation of the monetary resources needed to complete project work.Foundational
- Estimate to Complete (ETC)The expected cost to finish all remaining project work: ETC = EAC - AC.Intermediate
- Expected Monetary Value (EMV)Statistical value calculated as probability multiplied by impact for a risk, summed across outcomes.Intermediate
- Expected Value (EV)The probability-weighted average of all possible outcomes of a random variable: E[X] = Σ x × P(x).Intermediate
- Explicit KnowledgeKnowledge that can be codified using words, numbers, and pictures.Foundational
- Exploit (Risk Response)Opportunity response that seeks to ensure the opportunity definitely happens.Intermediate
- Failure Mode and Effects Analysis (FMEA)Structured method for identifying potential failure modes, their causes and effects, and prioritizing actions.Intermediate
- Fallback PlanAn alternative response used if the primary risk response proves ineffective.Intermediate
- Fast TrackingSchedule compression technique in which activities normally done in sequence are performed in parallel for at least part of their duration.Intermediate
- Feeding BufferIn critical chain scheduling, a buffer placed where a non-critical chain feeds into the critical chain.Advanced
- Final ReportSummary of project performance prepared at closure.Foundational
- Firm Fixed Price Contract (FFP)Contract in which the price is set and not subject to change unless scope changes.Foundational
- Fishbone DiagramA cause-and-effect diagram that organizes potential causes of a problem into categories.Foundational
- Fitness for UseQuality definition attributed to Joseph Juran: a product is of quality if it meets real needs of its users.Intermediate
- Five WhysRoot cause technique of asking 'why' repeatedly, typically about five times, to move from symptom to underlying cause.Foundational
- Fixed and Variable CostsFixed costs do not change with production volume; variable costs change with the amount of work or output.Foundational
- Fixed Price Incentive Fee Contract (FPIF)Fixed-price contract with an incentive for meeting performance targets and a price ceiling.Advanced
- Fixed Price with Economic Price Adjustment (FP-EPA)Fixed-price contract allowing predefined adjustments for changing conditions such as inflation or commodity costs.Advanced
- Forward PassCPM calculation of early start and early finish dates moving from project start to end.Intermediate
- Free FloatThe amount of time an activity can be delayed without delaying the early start of any successor.Intermediate
- Functional RequirementA requirement describing a capability or behavior the solution must provide.Foundational
- Funding Limit ReconciliationProcess of comparing planned expenditure with funding limits and adjusting the schedule to level expenditures.Advanced
- Gantt ChartA bar chart of schedule information with activities listed vertically and dates horizontally.Foundational
- Gold PlatingAdding extra features or functions beyond what was agreed, without customer request or approval.Foundational
- GovernanceThe framework of authority, accountability, and decision rights within which projects are directed and controlled.Intermediate
- Grade vs. QualityQuality is how well characteristics meet requirements; grade is a category for items with the same use but different technical characteristics.Foundational
- Ground RulesExpectations regarding acceptable behavior by project team members.Foundational
- Hammock ActivityA summary activity that groups related activities and spans their start and end dates.Advanced
- HistogramA bar chart showing the frequency distribution of data.Foundational
- Hybrid ApproachA combination of predictive and adaptive elements chosen to fit the project and its environment.Intermediate
- Identify RisksProcess of identifying individual project risks and sources of overall project risk and documenting their characteristics.Foundational
- Impact AnalysisAssessment of the effects a proposed change will have on stakeholders, requirements, the solution, and the project.Intermediate
- Imposed DateA fixed date placed on an activity or milestone, such as 'start no earlier than' or 'finish no later than'.Intermediate
- Incremental DevelopmentApproach that delivers a solution in successive usable pieces, each adding functionality.Foundational
- Individual Project RiskAn uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.Foundational
- Information RadiatorA highly visible display of project information placed where people can easily see it.Foundational
- Integrated Change ControlProcess of reviewing all change requests, approving or rejecting them, and managing changes to deliverables, documents, and the plan.Foundational
- Internal Rate of Return (IRR)The discount rate at which a project's net present value equals zero.Intermediate
- Iron Triangle InversionAgile reframing of the triple constraint in which time and cost are fixed and scope is variable.Intermediate
- IssueA current condition or situation that may have an impact on project objectives.Foundational
- Issue LogA project document where information about issues is recorded and monitored.Foundational
- Iterative DevelopmentApproach that develops a solution through repeated cycles, refining it based on feedback each time.Foundational
- Just-in-Time (JIT)Producing what is needed, when it is needed, in the amount needed.Foundational
- KaizenJapanese term for continuous, incremental improvement involving everyone.Foundational
- Knowledge AreaAn identified area of project management defined by its knowledge requirements and processes.Foundational
- Law of Diminishing ReturnsPrinciple that after a point, adding more input yields progressively smaller output gains.Intermediate
- Lead and LagLead is the time a successor can be advanced relative to a predecessor; lag is the time it must be delayed.Intermediate
- Lead TimeThe elapsed time from when a request is made (or committed) to when it is delivered.Foundational
- Lean ThinkingManagement philosophy derived from the Toyota Production System focused on maximizing customer value while minimizing waste.Foundational
- Learning CurvePrinciple that cost or time per unit decreases as experience with repetitive work increases.Intermediate
- Lessons Learned RegisterA project document recording knowledge gained during the project for use on the current and future projects.Foundational
- Letter of Intent (LOI)A non-binding document in which a buyer indicates the intent to award a contract.Intermediate
- Level of Effort (LOE)An activity that does not produce definitive end products and is measured by the passage of time.Advanced
- Life Cycle CostingConsidering the total cost of ownership of a product over its entire life, not just development cost.Intermediate
- Little's LawQueueing theorem stating average cycle time = average WIP / average throughput.Intermediate
- Logical Relationship TypesThe four dependency types between activities: finish-to-start, start-to-start, finish-to-finish, and start-to-finish.Intermediate
- Make-or-Buy AnalysisAnalysis used to determine whether work or deliverables are best produced internally or purchased externally.Foundational
- Manage Project KnowledgeProcess of using existing knowledge and creating new knowledge to achieve objectives and contribute to organizational learning.Intermediate
- Manage QualityProcess of translating the quality management plan into executable quality activities that incorporate quality policies.Intermediate
- Manage TeamProcess of tracking team member performance, providing feedback, resolving issues, and managing changes to optimize performance.Intermediate
- Management ReserveBudget withheld from the cost baseline for unforeseen work within project scope ('unknown-unknowns').Intermediate
- Milestone ChartA summary schedule that shows only the planned start or completion dates of major deliverables and external interfaces.Foundational
- Monitor and Control Project WorkProcess of tracking, reviewing, and reporting overall progress to meet performance objectives defined in the plan.Intermediate
- Monitor RisksProcess of monitoring the implementation of agreed-upon risk responses, tracking identified risks, identifying new risks, and evaluating effectiveness.Intermediate
- Monte Carlo SimulationStatistical technique that runs many randomized iterations over input ranges to produce a probability distribution of outcomes.Advanced
- MoSCoW PrioritizationPrioritization technique classifying requirements as Must have, Should have, Could have, and Won't have (this time).Foundational
- Motivation TheoriesTheories explaining what drives people at work, including Maslow, Herzberg, McGregor, McClelland, and Vroom.Intermediate
- Multicriteria Decision AnalysisTechnique using a decision matrix to evaluate options against weighted criteria.Intermediate
- Near-Critical PathA path whose duration is close to the critical path and has little float.Intermediate
- Negative FloatFloat with a value below zero, indicating that the schedule cannot meet a required date.Advanced
- NegotiationDiscussion aimed at reaching an agreement between parties with shared or opposed interests.Foundational
- Net Present Value (NPV)The present value of future cash inflows minus the present value of outflows, discounted at a required rate.Intermediate
- Nominal Group Technique (NGT)Group technique that enhances brainstorming with a voting process to rank the most useful ideas.Intermediate
- Non-Functional Requirement (NFR)A requirement describing conditions or qualities the solution must have, such as performance, security, usability, or availability.Foundational
- Operations ManagementOversight of ongoing, repetitive business activities that produce and sustain products or services.Foundational
- Opportunity CostThe value of the next-best alternative forgone when a choice is made.Intermediate
- Organizational Process Assets (OPA)Plans, processes, policies, procedures, and knowledge bases specific to and used by the performing organization.Foundational
- Organizational StructureHow an organization arranges authority, reporting, and resources, affecting project manager authority.Foundational
- Overall Project RiskThe effect of uncertainty on the project as a whole, arising from all sources including individual risks.Advanced
- Parametric EstimatingTechnique using an algorithm or statistical relationship between historical data and variables to calculate estimates.Foundational
- Pareto ChartA bar chart sorted in descending order of frequency with a cumulative percentage line, used to identify the vital few causes.Foundational
- Parkinson's LawThe observation that work expands to fill the time available for its completion.Intermediate
- Payback PeriodThe length of time required to recover the initial investment from net cash inflows.Foundational
- Percent Complete RulesConventions for claiming earned value on work packages, such as 0/100, 50/50, and 20/80.Advanced
- Perform Qualitative Risk AnalysisProcess of prioritizing individual project risks by assessing their probability of occurrence and impact.Foundational
- Perform Quantitative Risk AnalysisProcess of numerically analyzing the combined effect of identified risks and other sources of uncertainty on overall project objectives.Advanced
- Performance DomainA group of related activities critical to the effective delivery of project outcomes, as defined in the PMBOK Guide.Intermediate
- Performance Measurement Baseline (PMB)Integrated scope, schedule, and cost baselines used for comparison to manage, measure, and control project execution.Intermediate
- PESTLE AnalysisFramework examining Political, Economic, Social, Technological, Legal, and Environmental factors affecting an initiative.Foundational
- Phase GateA review at the end of a phase to decide whether to continue, modify, or end the project or program.Foundational
- Plan Risk ResponsesProcess of developing options, selecting strategies, and agreeing on actions to address overall and individual project risks.Foundational
- Planned Value (PV)The authorized budget assigned to scheduled work.Foundational
- Planning PackageA WBS component below the control account with known work content but without detailed schedule activities.Advanced
- Point of Total Assumption (PTA)In a fixed price incentive fee contract, the cost point above which the seller bears all cost overruns.Advanced
- PortfolioA collection of projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.Foundational
- Portfolio ManagementCentralized management of one or more portfolios to achieve strategic objectives.Intermediate
- Power TypesSources of influence a project manager can use: formal (legitimate), reward, coercive (penalty), expert, and referent.Intermediate
- Power/Interest GridA stakeholder mapping tool that classifies stakeholders by level of authority (power) and concern (interest).Foundational
- Precedence Diagramming Method (PDM)Technique for constructing a schedule model in which activities are represented by nodes and linked by logical relationships.Intermediate
- Precision vs. AccuracyPrecision is consistency of repeated measurements; accuracy is closeness of a measurement to the true value.Intermediate
- Predictive ApproachA development approach in which scope, schedule, and cost are determined in detail early in the life cycle.Foundational
- Present ValueThe current worth of a future sum discounted at a given rate: PV = FV / (1 + r)^n.Intermediate
- Preventive ActionAn intentional activity that ensures the future performance of project work is aligned with the plan.Foundational
- Privity of ContractLegal principle that only the parties to a contract have rights and obligations under it.Advanced
- Probability and Impact MatrixA grid that maps the probability of each risk against its impact on objectives to prioritize risks.Foundational
- Process GroupA logical grouping of project management processes: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.Foundational
- Procurement AuditStructured review of the procurement process from planning through closure to identify successes and failures.Advanced
- Procurement Statement of Work (SOW)A description of the procurement item in sufficient detail to allow prospective sellers to determine if they can provide it.Foundational
- Product AnalysisTechnique for asking questions about a product to translate high-level descriptions into tangible deliverables.Intermediate
- Product RoadmapA high-level, time-based view of how a product is expected to evolve toward its vision.Foundational
- Product ScopeThe features and functions that characterize a product, service, or result.Foundational
- ProgramA group of related projects, subsidiary programs, and activities managed in a coordinated way to obtain benefits not available individually.Foundational
- Program Evaluation and Review Technique (PERT)Estimating and scheduling technique using weighted average durations (O + 4M + P) / 6.Intermediate
- Program ManagementApplication of knowledge, skills, and principles to a program to achieve its objectives and benefits.Intermediate
- Progressive ElaborationThe iterative process of increasing the level of detail in a plan as more information and more accurate estimates become available.Foundational
- ProjectA temporary endeavor undertaken to create a unique product, service, or result.Foundational
- Project BudgetThe total funds authorized for the project, consisting of the cost baseline plus management reserves.Intermediate
- Project BufferIn critical chain scheduling, a buffer placed at the end of the critical chain to protect the target finish date.Advanced
- Project CharterA document issued by the sponsor that formally authorizes the project and gives the project manager authority to apply resources.Foundational
- Project Cost ManagementProcesses involved in planning, estimating, budgeting, financing, managing, and controlling costs to complete the project within budget.Foundational
- Project DocumentsRecords used to manage the project that are not part of the project management plan.Intermediate
- Project FloatThe amount of time a project can be delayed without delaying an externally imposed end date.Intermediate
- Project Funding RequirementsTotal and periodic funding needs derived from the cost baseline, often in incremental, non-continuous amounts.Advanced
- Project Integration ManagementProcesses and activities that identify, define, combine, unify, and coordinate project management activities.Foundational
- Project Kickoff MeetingA meeting at the start of planning or execution that communicates objectives, gains commitment, and explains stakeholder roles.Foundational
- Project Life CycleThe series of phases a project passes through from its start to its completion.Foundational
- Project Management Office (PMO)An organizational structure that standardizes project governance and facilitates sharing of resources, methods, tools, and techniques.Foundational
- Project Management PlanThe document that describes how the project will be executed, monitored and controlled, and closed.Foundational
- Project Management PrinciplesFundamental norms that guide behavior of project practitioners, as listed in the PMBOK Guide.Intermediate
- Project Manager (PM)The person assigned by the performing organization to lead the team responsible for achieving project objectives.Foundational
- Project MilestoneA significant point or event in a project, program, or portfolio with zero duration.Foundational
- Project Procurement ManagementProcesses necessary to purchase or acquire products, services, or results from outside the project team.Foundational
- Project Quality ManagementProcesses for incorporating quality policy into planning, managing, and controlling project and product quality requirements.Foundational
- Project Schedule ManagementProcesses required to manage the timely completion of the project.Foundational
- Project Schedule Network DiagramGraphical representation of the logical relationships among project schedule activities.Foundational
- Project ScopeThe work performed to deliver a product, service, or result with the specified features and functions.Foundational
- Project Scope ManagementProcesses that ensure the project includes all the work required, and only the work required, to complete successfully.Foundational
- Project SponsorThe person or group that provides resources and support for the project and is accountable for enabling success.Foundational
- Project Stakeholder ManagementProcesses to identify, analyze, engage, and monitor people or organizations that can affect or be affected by the project.Foundational
- Prompt ListA predetermined list of risk categories used to prompt identification of individual and overall project risks.Intermediate
- PrototypeAn early working model of a product used to obtain feedback before building the real thing.Foundational
- Psychological SafetyA shared belief that the team is safe for interpersonal risk-taking such as speaking up, admitting mistakes, or asking questions.Intermediate
- Quality AuditA structured, independent review of whether project activities comply with organizational and project policies and procedures.Intermediate
- Release PlanningPlanning activity that determines which features or stories will be delivered in upcoming releases.Intermediate
- Requirements Classification SchemaBABOK classification of requirements as business, stakeholder, solution (functional and non-functional), and transition requirements.Foundational
- Requirements DocumentationDescription of how individual requirements meet the business need for the project.Foundational
- Requirements Management PlanComponent of the project management plan describing how requirements will be analyzed, documented, and managed.Intermediate
- Requirements WorkshopStructured, facilitated meeting of key stakeholders to define, refine, prioritize, or reach closure on requirements.Foundational
- Reserve AnalysisTechnique comparing the remaining contingency reserves to the remaining risk to determine whether reserves are adequate.Intermediate
- Resource HistogramA bar chart showing the amount of time a resource is scheduled to work over a series of periods.Intermediate
- Resource LevelingResource optimization technique that adjusts start and finish dates to balance resource demand with supply.Intermediate
- Resource Management PlanComponent of the project management plan describing how team and physical resources are acquired, allocated, managed, and released.Foundational
- Resource SmoothingResource optimization technique that adjusts activities within their float so resource requirements stay within limits without changing the critical path.Intermediate
- Responsibility Assignment Matrix (RAM)A grid that shows the project resources assigned to each work package or activity.Foundational
- Return on Investment (ROI)Ratio of net benefit to cost: (gain - cost) / cost, expressed as a percentage.Foundational
- Risk AttitudeThe disposition of an individual or organization toward uncertainty, such as risk-averse, risk-neutral, or risk-seeking.Intermediate
- Risk AuditAn examination of the effectiveness of the risk management process and risk responses.Advanced
- Risk Breakdown Structure (RBS)A hierarchical representation of potential sources of risk.Intermediate
- Risk Data Quality AssessmentTechnique for evaluating the accuracy, reliability, and integrity of data about individual risks.Advanced
- Risk Management PlanComponent of the project management plan describing how risk management activities will be structured and performed.Foundational
- Risk RegisterCentral record of identified risks with their analysis, owners, treatment, and status.Foundational
- Risk ReportProject document summarizing information on individual project risks and the level of overall project risk.Intermediate
- Risk ThresholdSpecific measurable level of risk or uncertainty at which a response, escalation, or decision is triggered.Intermediate
- Risk TriggerAn event or condition indicating that a risk is about to occur or has occurred.Foundational
- Risk UrgencyA risk parameter indicating how soon a response must be implemented to be effective.Advanced
- Rolling Wave PlanningIterative planning technique in which near-term work is planned in detail while future work is planned at a higher level.Intermediate
- Rough Order of Magnitude Estimate (ROM)An early, low-accuracy estimate typically in the range of -25% to +75%.Foundational
- Rule of SevenControl chart heuristic: seven consecutive data points on one side of the mean indicate a non-random pattern.Intermediate
- S-CurveGraph of cumulative costs, labor hours, or other quantities plotted against time, typically shaped like an S.Intermediate
- Salience ModelStakeholder classification model based on power, urgency, and legitimacy.Advanced
- Scatter DiagramA graph plotting pairs of numerical data to show the relationship between two variables.Foundational
- Schedule BaselineThe approved version of the schedule model, changeable only through formal change control, used as a basis for comparison.Foundational
- Schedule CompressionTechniques used to shorten schedule duration without reducing scope.Intermediate
- Schedule Management PlanComponent of the project management plan establishing criteria and activities for developing, monitoring, and controlling the schedule.Intermediate
- Schedule ModelA representation of the plan for executing activities, including durations, dependencies, and other planning information.Advanced
- Schedule Performance Index (SPI)Measure of schedule efficiency: SPI = EV / PV.Foundational
- Schedule Variance (SV)Measure of schedule performance: SV = EV - PV.Foundational
- Scope BaselineThe approved version of a scope statement, WBS, and WBS dictionary, changeable only through formal change control.Foundational
- Scope Management PlanComponent of the project management plan describing how scope will be defined, developed, monitored, controlled, and validated.Intermediate
- Scope StatementDescription of the project scope, major deliverables, assumptions, constraints, and exclusions.Foundational
- Secondary RiskA risk that arises as a direct result of implementing a risk response.Intermediate
- Self-Managing TeamA team that internally decides who does what, when, and how.Foundational
- Sensitivity AnalysisQuantitative technique that determines which individual risks or uncertainties have the most potential impact on outcomes.Advanced
- Sequence ActivitiesProcess of identifying and documenting relationships among project activities.Foundational
- Servant LeadershipLeadership style that focuses on understanding and addressing team members' needs and development to enable high performance.Foundational
- Seven Basic Quality ToolsClassic quality tools: cause-and-effect diagram, flowchart, check sheet, Pareto chart, histogram, control chart, and scatter diagram.Foundational
- Share (Risk Response)Opportunity response that allocates ownership of an opportunity to a third party best able to capture it.Intermediate
- Situational LeadershipLeadership model in which the leader adapts style (directing, coaching, supporting, delegating) to followers' competence and commitment.Intermediate
- Six SigmaData-driven quality methodology aiming to reduce process variation to no more than 3.4 defects per million opportunities.Foundational
- Source Selection CriteriaAttributes the buyer uses to evaluate and select sellers.Intermediate
- Special Cause VariationVariation arising from specific, assignable causes outside the normal process.Intermediate
- Specification LimitsCustomer- or engineering-defined boundaries (USL and LSL) for acceptable output.Intermediate
- Stacey MatrixModel plotting agreement on requirements against certainty about technology to classify work as simple, complicated, complex, or anarchic.Intermediate
- StakeholderAn individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a project.Foundational
- Stakeholder AnalysisTechnique of systematically gathering and analyzing information to determine whose interests should be considered.Foundational
- Stakeholder CubeA three-dimensional refinement of grid models combining stakeholder dimensions such as power, interest, and attitude.Advanced
- Stakeholder Engagement Assessment MatrixA matrix comparing current and desired stakeholder engagement levels.Intermediate
- Stakeholder Engagement PlanComponent of the project management plan identifying strategies and actions to promote productive stakeholder involvement.Intermediate
- Stakeholder RegisterProject document containing identification, assessment, and classification of project stakeholders.Foundational
- Standard Deviation (PERT)Measure of estimate uncertainty calculated as (Pessimistic - Optimistic) / 6.Advanced
- Status ReportPeriodic report describing where the project currently stands on scope, schedule, cost, risks, and issues.Foundational
- Student SyndromeTendency to delay starting work until just before a deadline.Intermediate
- Sunk CostMoney already spent that cannot be recovered.Foundational
- SWOT AnalysisAnalysis of Strengths, Weaknesses, Opportunities, and Threats of an organization, project, or option.Foundational
- Tacit KnowledgePersonal knowledge such as beliefs, insights, experience, and know-how that is difficult to articulate and share.Intermediate
- TailoringDeliberate adaptation of the approach, governance, and processes to suit the project's context.Intermediate
- Team CharterDocument recording team values, agreements, and operating guidelines.Foundational
- Theory of Constraints (TOC)Management philosophy by Eliyahu Goldratt holding that every system is limited by at least one constraint.Advanced
- Three-Point EstimatingTechnique that uses optimistic, most likely, and pessimistic estimates to account for uncertainty.Foundational
- Time and Materials Contract (T&M)Hybrid contract with elements of fixed-price (unit rates) and cost-reimbursable (open total value).Foundational
- To-Complete Performance Index (TCPI)The cost efficiency required on remaining work to meet a target: TCPI = (BAC - EV) / (BAC - AC), or (BAC - EV) / (EAC - AC).Advanced
- Tornado DiagramA bar chart used in sensitivity analysis that ranks variables by their effect on an outcome, with the largest at the top.Advanced
- Total FloatThe amount of time an activity can be delayed from its early start without delaying the project finish date or violating a schedule constraint.Foundational
- Transition RequirementsTemporary requirements describing capabilities needed to transition from the current state to the future state.Intermediate
- Trend AnalysisTechnique examining project results over time to determine whether performance is improving or deteriorating.Foundational
- Triple ConstraintThe classic model that scope, time, and cost are interdependent, with quality affected by all three.Foundational
- Tuckman LadderModel of team development stages: forming, storming, norming, performing, and adjourning.Foundational
- Validate ScopeProcess of formalizing acceptance of completed project deliverables.Foundational
- Value Delivery SystemStrategic business activities that build, sustain, and advance an organization through portfolios, programs, projects, and operations.Intermediate
- Value Engineering (VE)Systematic approach to finding less costly ways to complete the same work while preserving function.Intermediate
- Variance AnalysisTechnique for determining the cause and degree of difference between baseline and actual performance.Foundational
- Variance at Completion (VAC)Projected budget deficit or surplus at project end: VAC = BAC - EAC.Intermediate
- VelocityThe amount of work, usually in story points, a team completes per iteration.Foundational
- Verified DeliverablesCompleted project deliverables checked and confirmed for correctness through Control Quality.Foundational
- Virtual TeamA group of people with shared goals who fulfill roles with little or no time spent meeting face to face.Foundational
- Watch ListA list of low-priority risks recorded for monitoring rather than active response.Intermediate
- Waterfall ModelA sequential life cycle where each phase is completed before the next begins.Foundational
- WBS DictionaryDocument providing detailed deliverable, activity, and scheduling information about each component in the WBS.Foundational
- Weighted Scoring ModelSelection method that rates options on criteria, multiplies by weights, and sums the scores.Foundational
- Wideband DelphiConsensus estimation technique in which experts estimate anonymously, discuss differences, and iterate.Intermediate
- Work Breakdown Structure (WBS)A hierarchical decomposition of the total scope of work to be carried out by the team to accomplish objectives and create deliverables.Foundational
- Work in Progress (WIP)Work items that have started but are not yet finished.Foundational
- Work PackageThe work defined at the lowest level of the WBS for which cost and duration can be estimated and managed.Foundational
- Work Performance Data (WPD)Raw observations and measurements identified during activities performed to carry out project work.Intermediate
- Work Performance Information (WPI)Performance data collected from controlling processes and analyzed in comparison with plan components and baselines.Intermediate
- Work Performance ReportsThe physical or electronic representation of work performance information compiled to generate decisions or awareness.Intermediate